Job vacancies at JVACEE Julius Nyerere Hydro Power Project (JNHPP) _ Various Posts. Elsewedy Electric has evolved into a global provider of energy, digital, and infrastructure solutions with a turnover of USD 3.8 billion in 2021. Listed on the Cairo stock exchange since 2006, we operate in five key business sectors: Wire & Cable, Electrical Products, Engineering & Construction, Digital Solutions, and Infrastructure Investments. At the heart of our approach is an all-in-one integrated Engineering, Procurement & Construction (EPC) service which enables us to deliver even the most complex projects on time and within budget.
Morogoro, Pwani, JVACEE, Julius Nyerere Hydro Power Project (JNHPP) In joint venture with The Arab Contractors of Egypt (Osman A. Osman & Co.), ELSEWEDY ELECTRIC is entrusted by the people and government of Tanzania to execute, The Julius Nyerere Hydropower Project.
40 Job vacancies at JVACEE Julius Nyerere Hydro Power Project (JNHPP) _ Various Posts
JVACEE is Urgently Looking for Competent Candidates to fill the available below Positions :-
1) Motor Grader Operators —- 10 positions
2) Excavator Operators ——– 20 Positions
3) Bull Dozer Operators ——– 03 Positions
4) Pipe Fitters ——————- 04 Positions
5) Supervisor Piping ———– 01 Positions
6) Supervisor HVAC ———— 01 Positions
7) Wheel Loaders ————— 04 Positions
Qualifications:
The Ideal candidate should posses a working experience of not less than 3 Years.
MODE OF APPLICATION
Interested candidates should send their up to date CV’s and ID (National, Voter’s ID or Driving License) to jobs@jvacee.com and Visit our nearest representative offices of Kisaki Morogoro, or Mloka Rufiji, Pwani.
Deadline is 10th July 2022.
Interviews and work station will be at Julius Nyerere Hydropower Project (JNHPP). This position is open for Tanzanian Locals only.